TURBINE GENERATOR GALLERY
Overhaul of two double flow LP turbines on a 670 Mw Westinghouse turbine generator. Photo shows both LP turbines disassembled.
next_turbine002007.gif
Photo 2
next_turbine002006.gif
Photo 3
next_turbine002005.gif
Photo 4
Photo right: Westinghouse 670 MW LP-2 rotor set in place ready for clearance checks.





(c) Copyright The Next Turbine Corporation 2009
Turbine Gallery
THE NEXT TURBINE CORPORATION
next_turbine002004.jpg
Photo right: Showing Allis Chalmers 450 MW ACPSI/KWU after overhaul. Ken Field of TNT installed this unit for ACPSI in 1980. Ken performed a major inspection in 2002. Unit holds world record for startups to full load.
Photo right: Installing the generator field in a large GE hydrogen cooled generator.